 |
|
Innovative Solutions for all your security & fire alarm needsECS is always working to develop state of the art products and providing those products with unparalleled service. With highly qualified Project Managers, a UL508 Listed panel shop, dedicated Service Department and a well organized & efficient support team, our portfolio has grown into a visual representation of ECS' craftsmanship and qualifications.
For all quotation and bid questions, or for further details on any of the projects listed, please contact Jim Blair at ext. 112, or by email at jim@ecs-systems.com
For a complete project list, . |
Please download Flash Player 9
|
Correctional Projects
Coyote Ridge Correctional Center - Connell, Washington
| Project Location: |
1301 N Ephrata St., Connell, WA 99326 |
| Total Construction Cost: |
$159 Million Dollars |
| Number of Cells/Sq ft: |
2392 Bed facility |
| Owners User Agency: |
Washington DOC Jack Olson, (360) 725-8213 |
| GC/CM: |
Hunt Construction/Lydig Construction: Joint Venture 11001 E Montgomery Drive Spokane, WA 99206 |
| Architect/Security Specialist: |
Design Build by Engineered Control Systems Integrus Architecture - Architect 10 S. Cedar St. Spokane, WA 99204 Jerry Winkler (509) 838-8681 |
| General Description of System: |
13 Touch Screen Work Stations which monitor and control 1,813 doors and alarming devices; IP based CCTV system consisting of more than 464 CCTV cameras and associated work stations; Microprocessor based Intercom System consisting of 1,209 Intercom Stations; Card Access System for employee verification located at 26 points on the facility grounds; CATV System consisting of 700 Outlets and 636 Head Phones; Taut Wire Perimeter Protection System protecting a perimeter fence line of approximately 5,200’. |
| Completion Date: |
December, 2008 |
 |
Washington State Prison, Close Security Compound, Phase I - Walla Walla, Washington
| Project Location: |
1313 N. 13th Ave. Walla Walla, WA 99362 |
| Total Construction Cost: |
$5.2 Million Dollars |
| Number of Cells/Sq ft: |
1200 Bed facility |
| Owners User Agency: |
Washington DOC Chris Bowman, (509) 526-6486 |
| GC/CM: |
Turner Construction 830 Fourth Ave. South, Suite 400 Seattle, WA 98134 Jim Goldman, (206) 505-6582 |
| Architect/Security Specialist: |
Design Build by Engineered Control Systems HDR - Architect 8550 W. Bryn Mawr Ave Suite 900 Chicago, IL 60631-3223 Larry Hartman, (773) 380-3004 |
| General Description of System: |
24 Touch Screen Work Stations which monitor and control 2.062 doors and alarming devices; IP based CCTV system consisting of more than 540 CCTV cameras and associated work stations; Microprocessor based Intercom System consisting of 1,452 Intercom Stations; Card Access System for employee verification located at 35 points on the facility grounds; CATV System consisting of 784 Outlets and 705 Head Phones; Taut Wire Perimeter Protection System protecting a perimeter fence line of approximately 5,000’; Sensor Coil Perimeter Protection System consisting of 5 interior fence lines. |
| Completion Date: |
September 2007 |
 |
Kitsap County Jail Addition & Remodel
| Project Location: |
614 Division St., Port Orchard, WA |
Total Construction Cost: Total System Value: |
$26,365,000.00 Dollars $1,318,250.00 Dollars |
| Number of Cells/Sq ft: |
Addition and Remodel of Existing jail. |
| Owners User Agency: |
Kitsap County 614 Division St. Port Orchard, WA Karen Ross, 360/337-4695 |
| GC/CM: |
JE DUNN 437 N. Columbia Blvd Portland, OR 97207 Keith Barnes, 503/978-0800 |
| Architect/Security Specialist: |
Design Build by Engineered Control Systems HDR - Architect 8550 W. Bryn Mawr Ave Suite 900 Chicago, IL 60631-3223 Larry Hartman, (773) 380-3004 |
| General Description of System: |
ECS provided 4 touch screens in central control and 9 touch panels in various locations. Systems supplied and installed include Touch Screen Control, Control Electronics, PLC, Card Access, Visitor Visitation, Nurse. Call, CCTV, CATV & Local Intercom. |
Contract Award Date: Original Completion Date: Actual Completion Date: Final Systems Value: Contract Adjustments: |
September 2001 May 2004 May 2004 $1,318,250.00 Dollars Owner requested changes and minimal design deficiencies. Legal claims were not made against the owner or other contractors by ECS. |
 |
Wapato Correctional Facility
| Project Location: |
114355 N. Bybee Lake Ct., Portland, OR |
Total Construction Cost: Total System Value: |
$22,600,000.00 Dollars $928,713.00 Dollars |
| Number of Cells/Sq ft: |
New Medium Security Facility |
| Owners User Agency: |
Multnomah County Portland, OR Aaron Wilson, 503/570-6854 Facility |
| GC/CM: |
Hoffman Construction 1300 SW Sixth Ave. PO Box 1300 Portland, OR 97207 Cary Bubenik, 503/221-8811 |
| Design Engineer |
HK Engineers Sherwood, OR 97140 Frank Hopkins, 503/625-4443 |
| Architects |
KMD 421 SW Sixth Ave. Suite 1300 Portland, OR 97204 John Poppy, 503/221-1474 |
| General Description of System: |
ECS provided hard panels at various locations within the building. Systems supplied and installed include Panel Control, PLC, Access Control, Visitor Visitation Duress Alarm, CCTV, MATV, Local & Master Intercom |
Contract Award Date: Original Completion Date: Actual Completion Date: Initial Systems value: Final Systems Value: Contract Adjustments: |
June 25, 2000 May 2004 May 2004 $928,713.00 Dollars $1,456,452.00 Dollars Owner requested changes and minimal design deficiencies. No Legal claims were made against the owner or other contractors by ECS. |
 |
Coffee Creek Women's Prison
| Project Location: |
11270 SW Clay Street, Sherwood OR |
Total Construction Cost: Total System Value: |
$110,000,000.00 Dollars $4,800,000.00 Dollars |
| Number of Cells/Sq ft: |
1800 bed facility, (600-bed dorm, Minimum Camp and 1200 Bed cells, Medium Facility) |
| Owners User Agency: |
Oregon Department of Corrections Salem Oregon, Richard Ross, 503/378-2247 (now with DPSST) |
| Construction Mgr CM: |
Mike S. Day Owner Rep & CM, 503/351-4050 Day & Associates CPM Inc. (Previous Principal & Partner of Vickers Foster & Associates for this project) 8138 SW 171st Pl, Beaverton, OR 97007 |
| GC/CM: |
Hoffman Construction 1300 SW Sixth Ave, PO Box 1300 Portland, OR 97207 Gerry Hein, 503/221-8811 |
| Design Engineer: |
Alta Consulting Services Inc. 11000 NE 33rd Pl. Suite 300, Bellevue, WA 98004 Dave Squier, 425/576-1202 |
| Architects: |
DLR Group 421 SW 6th Ave. Portland, OR 97204 Kent Larson, 503/274-2675 |
| General Description of System: |
ECS provided 6 touch screens in central control, 11 hard panels in various housing units and support buildings. Systems supplied and installed are Perimeter Fence Shaker System & Microwave Detection System, Touch Screen Control, Panel Control, PLC, Card Access, Nurse Call, CCTV, SATV and Intercom. Note: This project required ECS to have a subcontractor for the conduit systems, 120vac power, and wire pulling for the security electronics systems. All Systems required programming, testing, demonstration and overall ECS forces accomplished system coordination. |
Contract Award Date: Original Completion Date: Actual Completion Date: Initial Systems value: Final Systems Value: Contract Adjustments: |
October 20, 2000 April 1, 2002 April 15, 2002 $4,300,000.00 ($1,300,00.00 is subcontractor portion) $4,800,000.00 ($1,700,000.00 is subcontractor portion) Owner requested changes and minimal design deficiencies. No Legal claims were made against the owner or other contractors by ECS. |
 |
Multnomah County Justice Center Electronic Detention and Fire Alarm Upgrades Project
| Project Location: |
401 N. Dixon St., Portland, OR |
Total Construction Cost: Total System Value: |
$5,300,000.00 Dollars $5,300,000.00 Dollars to date |
| Number of Cells/Sq ft: |
16-story Maximum Security Detention Facility with Courtrooms, County Sheriff’s Department and Portland Police Department. |
| Owners User Agency: |
Multnomah County Aaron Wilson, (503) 988-5191 |
| GC/CM: |
Engineered Control Systems 2702 N. Perry Spokane, WA 99207 John Pachman, (509) 483-6215 Ext. 111 Day & Associates CPM, Inc. – Construction Management 8138 SW 171st Pl Beaverton, OR 97007 Mike Day, (503) 430-1133 |
| Design Engineer: |
MW Consultants – Design Build 222 N. Wall St. Suite 200 Spokane, WA 99201 Bruce Erdman, (509) 838-9020 |
| Architects: |
DLR Group 421 SW 6th Ave. Portland, OR 97204 Kent Larson, 503/274-2675 |
| General Description of System: |
Completely rebuild and update the Justice Centers electronic system for door monitoring, elevator control, inmate movement, surveillance and emergency alarms. Systems being supplied and installed include:
- Replacement of all Control Panels for Sheriffs Department
- Redesign on elevator controls, cab and lobby monitoring systems
- Upgrades to the center’s interior and exterior surveillance systems
- Redesign and coordination of Programming Logic System
- Modifications to the functional logic for each sub-system
- Integration of the facilities Intercom System with new control panels
- Modifications to the Portland Police Bureau’s control panel area (a temporary Master Control Room is constructed during these modifications)
- Replacement of the Visual and Audible Fire Alarm Detection & Notification System
|
| Completion Date: |
June 2006 |
 |
Fire Alarm ProjectsShriner's Hospital - Spokane Washington
| Project Location: |
Spokane, Washington |
| Total Construction Cost: |
$200,000.00 Dollars |
| General Description of System: |
FM200 Gas Fire Suppression System, New EST Fire Alarm System |
| Contact: |
Michael Hoover 509/623-0469 |
 |
Washington Trust Bank - Main Branch Spokane Washington
| Project Location: |
Spokane, Washington |
| Total Construction Cost: |
$600,000.00 Dollars |
| General Description of System: |
Replace existing access control and fire alarm/life safety systems in high-rise facility. |
| Contact: |
Karen Sprague 509/838-0007 |
 |
Eastern Washington University - Remodel
| Project Location: |
Cheney, Washington |
| Total Construction Cost: |
$900,000.00 Dollars |
| General Description of System: |
Fire Alarm System, CCTV, Access Control, Security Systems |
| Contact: |
Steve Bloom 509/359-6565 |
 |
Kootenai Medical Center
| Project Location: |
Coeur d'Alene, Idaho |
| Total Construction Cost: |
$500,000.00 Dollars |
| General Description of System: |
Fire Alarm, HVAC control |
| Contact: |
Dave Strange 208/666-3463 |
 |
Framatome ANP
| Project Location: |
Hanford, Washington |
| Total Construction Cost: |
$700,000.00 Dollars |
| General Description of System: |
Process Control Systems, HVAC Control Systems, Fire Alarm Systems, Security Systems. |
| Contact: |
Gary Fring 509/375-8560 |
 |
| |
|
 |
|