ECS is always working to develop state of the art products and providing those products with unparalleled service. With highly qualified Project Managers, a UL508 Listed panel shop, dedicated Service Department and a well organized & efficient support team, our portfolio has grown into a visual representation of ECS' craftsmanship and qualifications.

For all quotation and bid questions, or for further details on any of the projects listed, please contact Jim Blair at ext. 112, or by email at jim@ecs-systems.com

For a complete project list, Project List.

Please download Flash Player 9

Correctional Projects

Coyote Ridge Correctional Center - Connell, Washington

Project Location:

1301 N Ephrata St., Connell, WA 99326
Total Construction Cost: $159 Million Dollars
Number of Cells/Sq ft: 2392 Bed facility
Owners User Agency: Washington DOC
Jack Olson, (360) 725-8213
GC/CM: Hunt Construction/Lydig Construction: Joint Venture
11001 E Montgomery Drive
Spokane, WA 99206
Architect/Security Specialist: Design Build by Engineered Control Systems
Integrus Architecture - Architect
10 S. Cedar St.
Spokane, WA 99204
Jerry Winkler (509) 838-8681
General Description of System: 13 Touch Screen Work Stations which monitor and control 1,813 doors and alarming devices; IP based CCTV system consisting of more than 464 CCTV cameras and associated work stations; Microprocessor based Intercom System consisting of 1,209 Intercom Stations; Card Access System for employee verification located at 26 points on the facility grounds; CATV System consisting of 700 Outlets and 636 Head Phones; Taut Wire Perimeter Protection System protecting a perimeter fence line of approximately 5,200’.
Completion Date: December, 2008

Coyote Ridge Correctional Center


Washington State Prison, Close Security Compound, Phase I - Walla Walla, Washington

Project Location:

1313 N. 13th Ave. Walla Walla, WA 99362
Total Construction Cost: $5.2 Million Dollars
Number of Cells/Sq ft: 1200 Bed facility
Owners User Agency: Washington DOC
Chris Bowman, (509) 526-6486
GC/CM: Turner Construction
830 Fourth Ave. South, Suite 400
Seattle, WA 98134
Jim Goldman, (206) 505-6582
Architect/Security Specialist: Design Build by Engineered Control Systems
HDR - Architect
8550 W. Bryn Mawr Ave Suite 900
Chicago, IL 60631-3223
Larry Hartman, (773) 380-3004
General Description of System: 24 Touch Screen Work Stations which monitor and control 2.062 doors and alarming devices; IP based CCTV system consisting of more than 540 CCTV cameras and associated work stations; Microprocessor based Intercom System consisting of 1,452 Intercom Stations; Card Access System for employee verification located at 35 points on the facility grounds; CATV System consisting of 784 Outlets and 705 Head Phones; Taut Wire Perimeter Protection System protecting a perimeter fence line of approximately 5,000’; Sensor Coil Perimeter Protection System consisting of 5 interior fence lines.
Completion Date: September 2007

Washington State Prison, Close Security Compound


Kitsap County Jail Addition & Remodel

Project Location:

614 Division St., Port Orchard, WA
Total Construction Cost:
Total System Value:
$26,365,000.00 Dollars
$1,318,250.00 Dollars
Number of Cells/Sq ft: Addition and Remodel of Existing jail.
Owners User Agency: Kitsap County
614 Division St.
Port Orchard, WA
Karen Ross, 360/337-4695
GC/CM: JE DUNN
437 N. Columbia Blvd
Portland, OR 97207
Keith Barnes, 503/978-0800
Architect/Security Specialist: Design Build by Engineered Control Systems
HDR - Architect
8550 W. Bryn Mawr Ave Suite 900
Chicago, IL 60631-3223
Larry Hartman, (773) 380-3004
General Description of System: ECS provided 4 touch screens in central control and 9 touch panels in various locations. Systems supplied and installed include Touch Screen Control, Control Electronics, PLC, Card Access, Visitor Visitation, Nurse. Call, CCTV, CATV & Local Intercom.
Contract Award Date:
Original Completion Date:
Actual Completion Date:
Final Systems Value:
Contract Adjustments:
September 2001
May 2004
May 2004
$1,318,250.00 Dollars
Owner requested changes and minimal design deficiencies. Legal claims were not made against the owner or other contractors by ECS.

Kitsap County Jail


Wapato Correctional Facility

Project Location:

114355 N. Bybee Lake Ct.,
Portland, OR
Total Construction Cost:
Total System Value:
$22,600,000.00 Dollars
$928,713.00 Dollars
Number of Cells/Sq ft: New Medium Security Facility
Owners User Agency: Multnomah County
Portland, OR
Aaron Wilson, 503/570-6854 Facility
GC/CM: Hoffman Construction
1300 SW Sixth Ave. PO Box 1300
Portland, OR 97207
Cary Bubenik, 503/221-8811
Design Engineer HK Engineers
Sherwood, OR 97140
Frank Hopkins, 503/625-4443
Architects KMD
421 SW Sixth Ave. Suite 1300
Portland, OR 97204
John Poppy, 503/221-1474
General Description of System: ECS provided hard panels at various locations within the building. Systems supplied and installed include Panel Control, PLC, Access Control, Visitor Visitation Duress Alarm, CCTV, MATV, Local & Master Intercom
Contract Award Date:
Original Completion Date:
Actual Completion Date:
Initial Systems value:
Final Systems Value:
Contract Adjustments:
June 25, 2000
May 2004
May 2004
$928,713.00 Dollars
$1,456,452.00 Dollars
Owner requested changes and minimal design deficiencies. No Legal claims were made against the owner or other contractors by ECS.

Wapato Correctional Facility


Coffee Creek Women's Prison

Project Location:

11270 SW Clay Street, Sherwood OR
Total Construction Cost:
Total System Value:
$110,000,000.00 Dollars
$4,800,000.00 Dollars
Number of Cells/Sq ft: 1800 bed facility, (600-bed dorm, Minimum Camp and 1200 Bed cells, Medium Facility)
Owners User Agency: Oregon Department of Corrections
Salem Oregon, Richard Ross, 503/378-2247 (now with DPSST)
Construction Mgr CM: Mike S. Day Owner Rep & CM, 503/351-4050
Day & Associates CPM Inc. (Previous Principal & Partner of Vickers Foster & Associates for this project)
8138 SW 171st Pl, Beaverton, OR 97007
GC/CM: Hoffman Construction
1300 SW Sixth Ave, PO Box 1300 Portland, OR 97207
Gerry Hein, 503/221-8811
Design Engineer: Alta Consulting Services Inc.
11000 NE 33rd Pl. Suite 300, Bellevue, WA 98004
Dave Squier, 425/576-1202
Architects: DLR Group
421 SW 6th Ave. Portland, OR 97204
Kent Larson, 503/274-2675
General Description of System: ECS provided 6 touch screens in central control, 11 hard panels in various housing units and support buildings. Systems supplied and installed are Perimeter Fence Shaker System & Microwave Detection System, Touch Screen Control, Panel Control, PLC, Card Access, Nurse Call, CCTV, SATV and Intercom. Note: This project required ECS to have a subcontractor for the conduit systems, 120vac power, and wire pulling for the security electronics systems. All Systems required programming, testing, demonstration and overall ECS forces accomplished system coordination.
Contract Award Date:
Original Completion Date:
Actual Completion Date:
Initial Systems value:
Final Systems Value:
Contract Adjustments:
October 20, 2000
April 1, 2002
April 15, 2002
$4,300,000.00 ($1,300,00.00 is subcontractor portion)
$4,800,000.00 ($1,700,000.00 is subcontractor portion)
Owner requested changes and minimal design deficiencies. No Legal claims were made against the owner or other contractors by ECS.

Coffee Creek Women's Prison


Multnomah County Justice Center Electronic Detention and Fire Alarm Upgrades Project

Project Location:

401 N. Dixon St., Portland, OR
Total Construction Cost:
Total System Value:
$5,300,000.00 Dollars
$5,300,000.00 Dollars to date
Number of Cells/Sq ft: 16-story Maximum Security Detention Facility with Courtrooms, County Sheriff’s Department and Portland Police Department.
Owners User Agency: Multnomah County
Aaron Wilson, (503) 988-5191
GC/CM: Engineered Control Systems
2702 N. Perry
Spokane, WA 99207
John Pachman, (509) 483-6215 Ext. 111
Day & Associates CPM, Inc. – Construction Management
8138 SW 171st Pl
Beaverton, OR 97007
Mike Day, (503) 430-1133
Design Engineer: MW Consultants – Design Build
222 N. Wall St. Suite 200
Spokane, WA 99201
Bruce Erdman, (509) 838-9020
Architects: DLR Group
421 SW 6th Ave. Portland, OR 97204
Kent Larson, 503/274-2675
General Description of System: Completely rebuild and update the Justice Centers electronic system for door monitoring, elevator control, inmate movement, surveillance and emergency alarms. Systems being supplied and installed include:
  • Replacement of all Control Panels for Sheriffs Department
  • Redesign on elevator controls, cab and lobby monitoring systems
  • Upgrades to the center’s interior and exterior surveillance systems
  • Redesign and coordination of Programming Logic System
  • Modifications to the functional logic for each sub-system
  • Integration of the facilities Intercom System with new control panels
  • Modifications to the Portland Police Bureau’s control panel area (a temporary Master Control Room is constructed during these modifications)
  • Replacement of the Visual and Audible Fire Alarm Detection & Notification System
Completion Date: June 2006

Fire Alarm Projects

Shriner's Hospital - Spokane Washington

Project Location:

Spokane, Washington
Total Construction Cost: $200,000.00 Dollars
General Description of System: FM200 Gas Fire Suppression System, New EST Fire Alarm System
Contact: Michael Hoover
509/623-0469

Shriner's Hospital - Spokane Wa

Washington Trust Bank - Main Branch Spokane Washington

Project Location:

Spokane, Washington
Total Construction Cost: $600,000.00 Dollars
General Description of System: Replace existing access control and fire alarm/life safety systems in high-rise facility.
Contact: Karen Sprague
509/838-0007

Washington Trust Bank - Spokane Branch

Eastern Washington University - Remodel

Project Location:

Cheney, Washington
Total Construction Cost: $900,000.00 Dollars
General Description of System: Fire Alarm System, CCTV, Access Control, Security Systems
Contact: Steve Bloom
509/359-6565

Eastern Washington University

Kootenai Medical Center

Project Location:

Coeur d'Alene, Idaho
Total Construction Cost: $500,000.00 Dollars
General Description of System: Fire Alarm, HVAC control
Contact: Dave Strange
208/666-3463

Kootenai Medical Center

Framatome ANP

Project Location:

Hanford, Washington
Total Construction Cost: $700,000.00 Dollars
General Description of System: Process Control Systems, HVAC Control Systems, Fire Alarm Systems, Security Systems.
Contact: Gary Fring